Skip to content

template · scope: full

full-feature

Full lifecycle from ideation through maintenance with adversarial review gates.

Phases

  1. 1. ideation

    Required: idea.md

    Optional: research-notes.md

  2. 2. requirements

    Required: requirements.md

    Optional: stakeholder-notes.md

  3. 3. design

    Required: design.mdtasks.md

    Optional: architecture-diagram.md

  4. 4. implementation

    Required: code-complete.md

    Optional: implementation-notes.md

  5. 5. testing

    Required: test-results.md

    Optional: coverage-report.md

  6. 6. deployment

    Required: deployment-record.md

    Optional: rollback-plan.md

  7. 7. maintenance

    Required: maintenance-plan.md

    Optional: monitoring-config.md

Review gates

adversarial-review on: requirements, design